PREPARING YOUR MARINE SOLUTIONS
Offshore platform commissioning operations

Pre-Commissioning & Decommissioning End-to-End Offshore Asset Lifecycle Solutions

Offshore Transition Services

Tethys Plantgeria provides integrated pre-commissioning and decommissioning services for offshore oil & gas assets, ensuring regulatory compliance, operational safety, and environmental protection throughout the asset lifecycle.

Pre-Commissioning

Comprehensive readiness verification for new offshore installations prior to first production:

  • Pipeline flooding, gauging, and cleaning
  • Hydrotesting and leak detection
  • System flushing and chemical treatment
  • Commissioning spool installation
  • Safety system testing

Decommissioning

Safe and environmentally responsible retirement of offshore facilities:

  • Pipeline plugging and abandonment
  • Structure removal planning
  • Subsea equipment recovery
  • Seabed clearance verification
  • Regulatory compliance documentation

Our Methodology

Pre-Commissioning Process

1

System Flushing

2

Pressure Testing

3

Leak Detection

4

Chemical Treatment

5

System Handover

Decommissioning Process

1

Site Survey

2

Well P&A

3

Structure Removal

4

Site Clearance

Specialized Equipment & Compliance

Key Equipment

  • High-capacity pumping systems (10,000 psi)
  • Pipeline isolation tools (mechanical and gel plugs)
  • ROV-deployed cutting equipment
  • Subsea debris recovery tools

Compliance Standards

  • API RP 17N (Pre-commissioning)
  • ISO 13628-11 (Subsea decommissioning)
  • OGP Guidelines for abandonment
  • Local regulatory requirements (DPR, NOSDRA)

Need Offshore Transition Services?

Our team specializes in safe and efficient asset commissioning and retirement.